TUNNELS-KAMENA VOURLA-AG.KOSTANTINOS

  •  

    # PROJECT: PATHE bypass Kamena Vourla - St. Constantine 

    # CLIENT: AEGEK CONSTRUCTION SA / AKTOR 

    # SYSTEM: MISCELLANEOUS

    # Completion: 2008  

                 

    This section of the PATHE motorway was divided into two building projects. The first contract work included the two largest twin tunnels S1 and S2 and road construction department and was assumed by AKTOR. The second part of the twin tunnels to S3 and S6 were taken by AEGEK.

     

    NewALERT built CCTV on all tunnels , while for the second work contract we took over all the voltage subsystems. Specifically we were given the supply and manufacture of automation in the area with local independent SCADA in substation S6, the traffic lights and electronic signage, emergency telephony, vehicle detectors and detection of tunnel-substations and the fire substations. The automation system consists of double PLCs with dual I / O cards for ultimate redundancy. 

     

                The project in numbers: 8PLC, 63 cameras (including 20PTZ), 21 emergency calls, 46 LCS, 32 VSLS, 1 VMS.

     

    P1010075th P1010089th P1010068th
    P1010053th 000015th 000002th

     

     

     

     

Contact Us

Tel.  2295054206 

         2295023957 

Fax.  2295054213 

Web

Email : This email address is being protected from spambots. You need JavaScript enabled to view it.

Web : www.newalert.gr

Error. Page cannot be displayed. Please contact your service provider for more details. (7)